Project Description
TRAIN STATION HVAC
AUTOMATION SYSTEM (ECS)
|
|
|
Monitoring
and control systems are very
important to support the subsystems
used in the new generation train
stations.
The solution
also needs to be developed easily in
the future and applied to other
subsystems in order to include the
future expansion of the system.
System requirements
An improved
central monitoring and control
system, which can monitor six
different subsystems such as railway
station air conditioning system,
water supply and drainage systems,
normal and emergency lighting
systems, and elevators, is required.
In addition, an extra
communication network backbone is
required to guarantee reliability
and the solution is expected to
monitor power consumption and save
energy. |
|
|