Güç Kalitesi Ölçüm Sistemi TEİAŞ EK-8

POWER QUALITY MEASUREMENT SYSTEM (TEİAŞ ANNEX-8)
 

National Power Quality Measurement by sending a new notification to EİAŞ Connection Agreement signed power plants
By making necessary preparations within the scope of its system, it has made it necessary to establish Power Quality Measurement Systems in their facilities.
The facilities provided the necessary time for installation (ANNEX-8).
Controlmatik Annex-8 fulfills the responsibilities of the power plants by supplying and installing the Power Quality Measurement System.

CONNECTION AGREEMENT ANNEX-8 POWER QUALITY MEASUREMENT SYSTEM

1.  Harmonic Distortion and Fliker Measurement System (Power Quality Measurement System)

KUser, diğer Harmonic and Fliker Measurement Requirements “as well as other power quality
for measurement of parameters; at least 4 months prior to system connection
Harmonic to apply to our department and to be foreseen according to the planning
It will supply and install distortions and Fliker Measurement Systems (Power Quality Measurement System).

2.  Mounting Point and Installation of National Power Quality Measurement System

(Where and How to Install)
The power quality measurement system will be placed at the measuring points / points of the system.
Power Quality Measurement board available at the center where the measuring system will be installed
and, if appropriate, the device will be mounted to this panel. Otherwise the device with the dashboard
will be installed by the user together.
In case of problems in the application, opinions of the related unit of TEİAŞ will be taken.

3. Measurement Parameters and Measurement Accuracy Required

The measuring devices to be installed are below the power quality parameters given in Table-1.
perform continuous measurement and analysis according to the specified standards.
IEC 61000-4-30 Ed2.0 (2008-10) Electromagnetic compatibility, Part 4-30: Testing and measuring techniques (measuring energy quality methods) - Class A (Class - A)
IEC 61000-4-7 Ed2.1 (2009-10) Electromagnetic compatibility, Part 4-7: Experiments and measurement techniques (harmonic and interharmonics) - Class 1 (Class - 1)
IEC 61000-4-15 Ed2.0 (2010-08) Electromagnetic compatibility, Part 4-15: Test and measuring techniques (flicker meter) - Class A (Class - A)
IEC 61000-2-4 Ed2.0 (2002-06) Electromagnetic compatibility (EMC) - Part 2-4: Environment - Compliance Levels in industrial plants for low frequency transmitted disturbances

4. Event Recording

Power quality meters, pit (right), peak (swell) and interruption
25600 current and voltage waveforms by detecting power quality events in types
record at the speed of sample / second.
If power quality events last less than 3 seconds, "short time" is longer than 3 seconds
it is referred to as "long term". Short-term events single event file, long-term
in case of an event 2 different event file records of the beginning and end of the event
It should be established.
When an event is detected, if the event is short-lived or is the beginning of a long-term event,
0.5 seconds before event time, 2.5 seconds after the event time, if event
if the end of a long-term event is 0.5 seconds after 2.5 seconds before the event time.
The voltage and current raw data of the last 3 seconds must be recorded together with the event information.

5. Communication

Power quality measurement devices record the power quality measurement and event data
transfer the connection agreement to a server in the user of the transmission system.
This data is in the file structure described in 5.1 with the secure file transfer protocol (sftp)
It will be stored in a folder that can be accessed continuously by TEİAŞ. Power quality measurement
Each of the files must consist of a total of one hour data. Event data for each event
It should consist of 3 seconds of raw data. TEİAŞ National Power Quality Monitoring System servers
TEİAŞ National Power Quality Monitoring of the data by periodically accessing this folder by
The system will be transferred to.
Power Quality Measurement and Event Data File Structures System by TEIAS
It will be provided to the user and the corresponding user will provide the software according to this file structure.

6. Data Storage

Loss of measurement data when communication condition is not suitable
the device in question will store the measurement results for at least 6 months
must have the capacity.

7.  Measurement Synchronization

Promise to address the sources of power quality problems correctly
the device should be capable of time synchronization via GPS + NTP.
Time uncertainty is less than 20 milliseconds to IEC 61000-4-30 Ed2.0 (2008-10)
should be. This feature means that the measurement periods are synchronized (simultaneous) and
therefore, it is important to determine the sources of power quality problems and their effects on the system.
In addition, IEC 61000-4-30 Ed2.0 (2008-10) for simultaneous measurement and analysis
The measurement periods according to the standard should start at the beginning of 10 minutes.

 